Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 23, 2024

February 23, 2026

I-290

Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

I-290, Elmhurst, IL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Complexity Factor for this project is 0.07. This project requires 24% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 25, 2023, at 9:00 AM at the Region One/District One Office in Schaumburg. The department anticipates this project will be delivered using the Construction Management/General Contractor (CMGC) method as defined in the Department's Innovative Project Delivery Draft Manual and Guidelines. The Consultant will have the role of Engineer of Record (EOR) whilst developing the Phase II Engineering scope of work relevant to this project. Refer to the Manual and Guidelines for the various roles and responsibilities under the CMGC delivery method. In general, the role of the EOR develops the Phase II design to a level that allows a CMGC to prepare a price and schedule for the project. The EOR will work collaboratively with the CMGC and the department to develop the technical details to build the project. The department and the CMGC will negotiate a Guaranteed Maximum Price (GMP) for the construction management and construction based on the information prepared by the EOR. If the CMGC and the department cannot arrive at a mutually agreeable GMP the department may choose to ask for a GMP proposal from another CMGC or may choose to have the EOR proceed with Phase II Engineering for the purpose of a Design-Bid-Build Delivery Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The estimated construction cost for this project is $250,000,000 to $300,000,000. The completion date for this contract will be 18 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Special Plans (Lighting: Complex) Special Services (Electrical Engineering) The Environmental Reports (Environmental Assessment) prequalification category requirement may be completed by the Sub and/or Prime Consultant. The environmental work must be performed using staff that has been presented in your most recently approved Statement of Experience and Financial Condition. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 05 - RFQ Engineering - FAI 290 (Eisenhower Expressway) Drainage Improvements from West of Des Plaines River to East of Austin Blvd., Phase II Project, Cook County

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.