Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 2, 2023

October 2, 2023

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, San Diego, CA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Online Q&A No 70TH-ALVARADO TO SARANAC-SIDEWALK: To install new concrete sidewalk on the west side of 70th street between Alvarado Road and Saranac Street. The work is to include installation of new 4 and 5 wide concrete sidewalk, curb ramp, curb and gutter, retaining walls, pedestrian push buttons, chain link fencing, bike lane striping, traffic and signing, and relocation/adjustment of pedestrian barricade and signs. MONTEZUMA PPL/MID-CITY PIPELINE PH 2: To install new water pipeline, which consists of approximately 4,880 linear feet of new 66" diameter CML & TC steel transmission main and 374 linear feet of 8-inch PVC distribution main. Work also includes associated required street ADA improvements and paving. The 66-inch transmission main will run southward from the Alvarado Water Treatment Plant (AWTP) to the intersection of 69th and Mohawk Street. The north terminus of the pipeline will be connected to existing Valve Vault No. 3 located where the Earl Thomas Reservoir Outlet Pipeline intersects the Clear Wells Interconnection Pipeline. The south terminus will connect to the Mid-City Phase 2A Pipeline just easterly of the 69th and Mohawk Street intersection. Additionally, work includes the relocation and construction of a Helix Water District 8-inch PVC distribution main running across Lake Murray Blvd and relocation of a City of La Mesa 8-inch sewer pipeline and associated manholes. Lastly, the landscaped medians along Lake Murray Blvd will be removed and rebuilt as part of this project.

107 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.