Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
June 27, 2023
February 27, 2024
No Information to Display
Multiple Locations
Renovation
No Information to Display
No Information to Display
Public - State/Provincial
Multiple Locations, San Diego, CA
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
**As of August 3, 2023. The owner has determined a prequalified list of general contractors Project scope may include; replacement of relay controller with new microprocessor control system with solid-state starter and battery lowering device; replacement of submersible pump units with new submersible power unit assemblies; install seismic rupture valve; replacement of door operator and associated hoistway door equipment with new high speed solid state micro-processor closed loop door operator; replacement of hoistway and machine room wiring with all new code complying wiring; replacement of signals and operating fixtures with new fixtures (ADA); installation of new underground cylinder with PVC casing; and replacement of lighting in machine room and elevators cars. The project scope may also include repairs and replacement of existing geared machines and DC motors with new AC gearless machines; existing deflector sheaves with new, mounted in machine room if possible; existing PC Board Logic Controllers with new non-proprietary solid state micro-processor control systems; existing SCR drives with new VVVF AC regenerative motor drive units; existing hoistway and machine room wiring with all new code complying wiring; existing governors with new; existing car traveling buffers with new pit mounted buffers; exiting car and counterweight roller guides with new; existing ceilings with new downlight ceilings with energy efficient LED lights; add emergency battery power rescue unit; existing signals and operating fixtures with new fixtures; and removal of heat sensors. Attendance at the Prequalification Conference is mandatory for Contractors attempting to become prequalified to bid on this specific project. No Prequalification Questionnaire will be received after 4:00 P.M., Tuesday, June 27, 2023. Estimated Project Duration: 365 calendar days
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
San Diego, CA
Bid Date: Aug 02 2023
San Diego, CA
Bid Date: Aug 02 2023
San Diego, CA
Bid Date: Aug 16 2023
San Diego, CA
--
San Diego, CA
Bid Date: Aug 07 2023
San Diego, CA
Bid Date: Aug 29 2023
San Diego, CA
Bid Date: Sep 07 2023
San Diego, CA
Bid Date: Oct 12 2023
San Diego, CA
Bid Date: Aug 24 2023
San Diego, CA
Bid Date: Sep 05 2023
San Diego, CA
Bid Date: Aug 31 2023
San Diego, CA
Bid Date: Aug 29 2023
San Diego, CA
Bid Date: Aug 28 2023
San Diego, CA
Bid Date: Aug 16 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
