Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 16, 2025

September 11, 2023

October 11, 2023

517 7th Ave S

Demolition, Site Work

No Information to Display

$202,910.00

Public - Federal

img_map_placeholder

517 7th Ave S, Wolf Point, MT

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Demolition of the Wolf Point HeadStart Building This item involves site preparation activities for building demolition, including but not limited to, preparation of the construction staging area, site security, dust control, housekeeping, traffic control, and other site preparation and site services as described in this section. Contractor(s) shall be always responsible for security of his equipment and material. No security will be provided by the Owner. A portion of this project is funded by the ARPA Funding and therefore the work must be completed by a Contractor in accordance with all federal fair labor practices and procurement statutes, including: 1. Compliance with Federal Davis-Bacon prevailing wage rates and reporting requirements. Certified payroll reports are required by the Contractor to document compliance with prevailing wage rates and must be submitted to the Owner on Form WH-347 when invoices are submitted for work. 2. Compliance with reporting requirements for the utilization of all Minority/Disadvantaged Business Enterprises (MBE/DBE) is required. A MBE/DBE Utilization Reporting Form must be submitted with your bid; and,

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.