Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 15, 2023

September 14, 2023

No Information to Display

2501 Freedoms Way

Renovation

No Information to Display

$129,974.00

Public - City

img_map_placeholder

2501 Freedoms Way, Warrington, PA

Subscribe to View Full Documents

The work to be performed under this Contract generally consists of the furnishing and installation of a new swimming pool PVC membrane lining system to replace the existing lap pool liner at the Mary Barness Community Pool. The work includes the removal of the existing pool liner, all surface preparation, and installation of the new PVC membrane system. The installation shall include all compression flanges, transitions, termination fittings, and sealants. All construction will occur on Township property. Bids must be accompanied by a certified check, bank draft, or bid bond issued by a surety company licensed to conduct business in the Commonwealth of Pennsylvania, in the amount of at least ten percent (10%) of the total Bid Amount made payable to the Township. The successful bidder will be required to furnish separate bonds with corporate surety issued by companies authorized to do business in the Commonwealth of Pennsylvania on the prescribed forms dated the date of the Contract, or separate Federal or Commonwealth chartered lending institution irrevocable letters of credit in a form accepted and approved by the Township, or separate restrictive or escrow accounts with such lending institutions pursuant to an escrow agreement accepted and approved by the Township, each equal to one hundred percent (100%) of the Contract amount, to secure (a) the faithful performance and maintenance of the Contract; and (b) the prompt payment of materials and labor. All bids must include lump sum or unit prices to be considered for award by the Township at their option after review of the bid amounts

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects