Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 21, 2023

October 23, 2023

January 19, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$1,500,000.00

Public - City

img_map_placeholder

Multiple Locations, Lighthouse Point, FL

Subscribe to View Full Documents

The City desires to hire a Contractor to perform bridge repairs on eight bridges. The bridges included in the project are 1) Bridge 867200 over the Pelican Waterway on N.E. 28th Street, 2) Bridge 867201 over the Tern Waterway on NE 29th Street, 3) Bridge 867203 over the Heron Waterway on NE 31st Court, 4) Bridge 867205 Bridge over Cap Knight Bayou (Sample Road), 5) Bridge 867207 over the Alamanda Waterway on NE 24th Avenue, 6) Bridge 867208 over the Coral Key Waterway on NE 48th Street, 7) Bridge 867209 over the Egret Waterway on NE 49th Street, and 8) Bridge 867210 over the North Grand Canal on NE 22nd Avenue. A certified check, cashier's check, bank officer's check, or bid bond for ten percent (10%) of the amount bid, made payable to the City of Lighthouse Point, shall accompany each proposal. Performance bond and payment bond: Successful Proposer shall execute and furnish to City a Performance Bond and a Payment Bond for 110% of the construction cost within 15 days upon execution of the written agreement between the City and successful Proposer. Minority Businesses, Women's Business Enterprises, and Labor Surplus Area Firms are encouraged to submit proposals. Selected Proposer will be responsible for providing a qualified work crew, under supervision, in sufficient numbers on site to complete the work within ninety (90) days of Notice to Proceed. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph. (1) of this section, in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (1) of this section. The City of Lighthouse Point reserves the right to reject any and all proposals, to waive any and all informalities and irregularities, and to accept or reject all or any part of any proposal as they deem to be in the best interest of the citizens of the City of Lighthouse Point, or the City may reject proposals and re- advertise, or award the work for less than eight bridges.

52 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects