Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 23, 2023

September 22, 2023

June 30, 2024

Multiple Locations

Site Work

No Information to Display

$700,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Oak Leaf, TX

Subscribe to View Full Documents

Construction of Miscellaneous Improvements at Wilson Creek Lift Station and the Procurement and Installation of Two Parallel 42 This project spans Wilson Creek Lift Station, off of Old Mill Road by the old City landfill on the south end and North McKinney Lift Station, off of Airport Drive and Greenville Road on the north end in McKinney, TX. Project includes construction of miscellaneous improvements at Wilson Creek Lift Station and the procurement and installation of two parallel 42" transfer force mains (Force Main A and B) for total of 30,350 LF of pipe from Wilson Creek Lift Station to North McKinney Lift Station via Old Mill Road, Couch Drive, FM 546 and along Airport Drive. A bid alternate is included in this Contract for a Force Main A and B alternative alignment option that deviates from alignment route described above at Airport Drive and Industrial Boulevard to Airport Drive and Enloe Road (approx. from sta. 59+84 to 114+00). The alternative alignment shall be routed along the east side of the Encore Wire property from Industrial Boulevard to Enloe Road where it resumes the base bid alignment, for a total of 34,500 LF of pipe from Wilson Creek Lift Station to North McKinney Lift Station. This bid alternate may be added or deleted by the District, a determination will be made in August 2023. If the alternative alignment is selected, revised construction documents will be provided to the contractor by December 2023

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.