Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

October 16, 2023

April 13, 2024

To Be Determined

Site Work

No Information to Display

$5,513,727.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Andersonville, GA

Subscribe to View Full Documents

Project scope of work: The Georgia Comprehensive Solid Waste Management Act of 1990 authorizes the EPD Director to take preventive or corrective actions where the release of contaminants presents an actual or potential threat to human health or the environment. O.C.G.A. 12-8-27.1(a)(2). The abandoned Fauconniere Buckeye Cellulose Industrial Landfill will need to be properly closed to address existing and potential environmental impacts. The following activities are required for closure: o Install and improve existing site access controls o Properly remove and dispose of any waste not appropriate for unlined solid waste disposal facilities on the surface of each landfill site (creosote railroad ties, machinery, etc.) o Clear and grub each disposal site o Install and improve existing erosion and sedimentation (E&S) controls o Grade site to ensure positive drainage off the waste mass o Install final cover system o Abandon three (3) groundwater monitoring wells o Construction quality assurance and control GSFIC will use the e-Builder Project Management system to receive, review and store contractor bids and supporting documents. Additional information on this process and a link to the project site is provided below in the Invitation to Bid document and the e-Builder Registration & Bid Submittal User Guide. The Material Completion Date is 180 calendar days from the date of Notice to Proceed. Grassing and seeding will need to take place on April 15, 2024

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects