Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

September 11, 2023

March 9, 2024

8th Ave

Demolition, Renovation, Site Work

No Information to Display

$1,665,338.00

Public - City

img_map_placeholder

8th Ave, Safford, AZ

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The 8th Avenue Substation Upgrade project expands the existing 69 kV transmission line and switching capability to allow for improved operability and maintenance of the station equipment. As a part of this project, the existing 69 kV circuit switchers and breaker will be replaced with new breakers and several new switching devices. New buswork and conductor jumpers will interconnect the various equipment items as noted on the drawings and details provided. A phased construction sequence will be required to allow for continuous operation of the station while improvements are made. As such, construction in and around an energized station will be required for this project. Construction plans include demolition of existing equipment, foundations and controls wiring, installation of new foundations, structural steel, steel transmission poles, station components and cabling will be required. Commissioning will be provided in conjunction with the engineer of record for the project who will also be performing construction review services. All bidders must have a Bidders Qualification Statement on file with the Engineer, without exception. The commencement date of construction of the project shall be no later than 45 days after Approval of the Contract by the Owner. Approval, if granted, is expected to be made on August 28th, 2023. Construction shall be completed within 180 calendar days after the commencement date. Liquidated damages of $100.00 per day shall be assessed as provided for in Article V, Section 2 of the Contractor's proposal. City of Safford reserves the right to waive any informality or reject any and all bids.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.