Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 9, 2023

October 9, 2023

September 6, 2024

9031 W Houghton Lake Dr

Demolition, New Construction, Paving, Site Work

No Information to Display

$3,568,480.00

Public - State/Provincial

img_map_placeholder

9031 W Houghton Lake Dr, Houghton Lake, MI

Subscribe to View Full Documents

As of Aug 21, 2023 the project has not yet been awarded. A timeline for award has not yet been established . Work within the South Unit includes earthen dike rehabilitation including reshaping of side slopes, increasing the height of the dikes, construction of an aggregate surface, and slope restoration. The feeder channel from Houghton Lake to the pump station impoundment basin shall be dredged. The existing pump station along with piping and supports will be demolished and removed from the site. A new pump station including wet well, reinforced fiberglass enclosure with foundations, debris chamber, grating, handrails, piping, valves and supports, pump, and electrical components shall be constructed. The existing concrete control structures shall be demolished and removed from the site and replaced with a new concrete control structure with wooden stop logs. NORTH UNIT Work within the North Unit includes earthen dike rehabilitation including reshaping of side slopes, increasing the height of the dikes, construction of an aggregate surface, and slope restoration. Removal and replacement of a concrete headwall with toplogs water control structure with a 48-inch diameter pipe. Construction of two new 4- space gravel parking areas. Construction of a new aluminum water control structure with stop logs. Houghton: Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Paul Repasky at prepasky@WadeTrim.com no later than 4:00 p.m., Eastern on July 26, 2023.

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects