Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 16, 2023

September 15, 2023

January 13, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$234,060.00

Public - City

img_map_placeholder

Multiple Locations, Mason, MI

Subscribe to View Full Documents

2023 W. Columbia St. Sidewalk Over US-127 fully complete the various items of construction within 120 consecutive calendar days This project consists of concrete sidewalk and curb installation along the South side of W. Columbia St. over the US-127 overpass, connecting the Corbin St. area on the West side to the Walnut St. area on the East side. Variable size runs of 4, 6 and 7 concrete sidewalk, storm sewer piping, ditch enclosure, clearing and grading, minor bituminous hand patching, concrete drive approach, sidewalk ramps and curb and gutter replacement are all within street R.O.W. and all within the City of Mason, City Limits. Construction shall include: Installation of 4 concrete sidewalk totaling approximately 2,400 Sft; installation of 6 concrete sidewalk and ramps totaling approximately 1,950 Sft; installation of 7 concrete sidewalk totaling approximately 2,600 Sft; concrete curb and gutter removal and replacement totaling approximately 300 Lft; 6 concrete ADA ramps totaling approximately 800 Sft with truncated dome panels; 12 storm sewer construction totaling approximately 160 Lft including one (1) 24 dia. catch basin with flat grate; filling of an existing ditch after the placement of the storm sewer totaling approximately 100 Cyd of backfill; limited bituminous hand patching; limited drive approach work; Barricades and Traffic Control; limited slope embankment; restoration and clean-up; pavement markings; and other miscellaneous work items, that are normally included with the described work items.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.