Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 3, 2023
August 15, 2023
October 31, 2023
40 Paige St
Renovation
No Information to Display
$135,000.00
Public - City
40 Paige St, Lowell, MA
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Freshman Academy Mechanical Project, GC has DCAMM in plumbing. Freshman Academy Mechanical Project Work Scope Steam Plant Cut/Cap/Isolate and remove steam line and all associated hangers/brackets that feeds Freshman Academy-Contractor to Run Boilers to ensure there are no steam leaks (Contractor responsible for removal of all trash and Debree from work)-Repair brick wall where lines once penetrated exterior brick walls. Freshman Academy Remove heat exchanger and all associated parts such as (valves-pneumatic controls and lines-Isolation valves-piping/insulation (Prep/cut back/rework domestic cold-water feed to be tied into new boilers being installed Location to be determined by owner). (Contractor responsible for removal and disposal of all associated trash and Debree). Remove AHU#1 and all associated controls-duct work and insulation to be cut back far enough to allow installation and retro fit of new unit-Remove controls and wiring as needed (to be determined by owner). (Contractor responsible for removal and disposal of all trash and associated Debree). Install New AHU#1 contractor supplied with free cooling capability/fresh air bypass-tie in to fresh air intake-tie in fresh air controls to existing control panel in pent house-tie in to existing duct work-repair install duct insulation as needed-Tie in all associated piping/valves/isolation valves/pipe insulation-Tie in to electrical panel-tie in to control panel located in penthouse-remove 3 existing pneumatic actuators and install 3 new contractor supplied DDC controls and valves-tie in new DDC controls to existing control panel ensure proper communication and operation between panel and controls (One actuator located in HV Fan room top floor).Contractor responsible for initial startup and run through of equipment and controls to ensure proper operation of unit and controls-start up report to be submitted to owner.(Contractor responsible for removal of all associated trash and Debree). Remove Condensate return tank (Salvage Condensate Return tank for reuse in 1922 Building) and all associated electrical wiring-conduit back to panel/controls-valves-piping-steam traps-hangers-brackets etc. (Contractor is responsible for removal and disposal of all trash and associated Debree). Contractor to remove old condensate return tank from basement in LHS 1922 Building and disconnect from electrical disconnect and existing piping as needed-Contractor to remove and replace 20 feet of 2 1/2 " black pipe-2 1/2 " black union that ties in to the rear of the condensate tank leaking towards unionContractor to install pad under condensate tank prior to installing salvaged tank to create barrier between tank and floor (Dirt)-Contractor to install Salvaged condensate return tank from the Freshman Academy-rework pipe tie ins as needed-replace electrical disconnect-replace electrical whip-Tie in main electrical feed from disconnect to Salvaged condensate tank-Perform initial start-up and submit report to owner. (Note no controls associated with the set up just main power feed
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Lowell, MA
Bid Date: Aug 02 2023
Lowell, MA
Bid Date: Aug 02 2023
Lowell, MA
Bid Date: Aug 02 2023
Lowell, MA
Bid Date: Jul 31 2023
Lowell, MA
Bid Date: Aug 24 2023
Lowell, MA
Bid Date: Aug 18 2023
Lowell, MA
--
Lowell, MA
Bid Date: Aug 31 2023
Lowell, MA
Bid Date: Sep 01 2023
Lowell, MA
Bid Date: Nov 15 2023
Lowell, MA
Bid Date: Aug 31 2023
Lowell, MA
Bid Date: Aug 17 2023
Lowell, MA
Bid Date: Aug 16 2023
Lowell, MA
Bid Date: Aug 04 2023
Taunton, MA
Bid Date: Aug 03 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.