Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 1, 2023

October 30, 2023

March 18, 2024

265 Riverside St

Renovation

No Information to Display

$2,880,481.00

Public - City

img_map_placeholder

265 Riverside St, Lowell, MA

Subscribe to View Full Documents

A. The Work under the Contract consists of: 1. All Work either shown on the Drawings or included in the Specifications unless specifically indicated as not to be done. 2. The project consists of the renovation of approximately 2,400 gross square feet of existing space on the ground floor of Olney Hall. The space includes rooms G15, G17, G17A, G17B, G19B, G19C, G19D, and G19E. The primary goal of the project is to renovate these spaces to accommodate Dean Melikechs laser lab including the Shen set-up, femtosecond laser lab, and providing a shared prep lab and write-up space. B. In addition, the Work under the Contract includes: 1. Work outside the Project Site as called for in the Contract Documents and as required for the performance of the Work. 2. The restoration of any items damaged or destroyed by encroaching upon areas outside the Project Site. 3. Providing and restoring, where appropriate, all temporary facilities. The Project consists of: The project consists of the renovation of approximately 2,400 gross square feet of existing space on the ground floor of Olney Hall. The space includes rooms G15, G17, G17A, G17B, G19B, G19C, G19D, and G19E. The primary goal of the project is to renovate these spaces to accommodate Dean Melikechs laser lab including the. Olney Hall Laser Labs. Provide two new laser labs with prep space, hood, experiment write up space, and water system. These spaces will also be supported with new ACCU, Chiller, and exhaust fan. The demolition will include hazardous abatement. Fixed casework and some lab furniture will also be included. Estimated Cost $2,800,000 Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Submit RFIs/questions in writing to kmailloux@umassp.edu. General Bid Deadline : 8/23/23 Time : 2:00 P.M.

47 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.