Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 23, 2024

March 25, 2024

July 28, 2025

To Be Determined

Site Work

No Information to Display

$10,000,000.00

Public - Federal

img_map_placeholder

To Be Determined, Kennedy Space Center, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

This Design/Build project is to design and replace the existing overhead power line B in its entirety along Static Road at Kennedy Space Center. The work entails designing and then performing the removal of all the wooden poles and replacing them with new concrete poles and new power lines designed and constructed to Florida Power & Light (FPL) standards, the Florida Building Code, and the National Electrical Safety Code (NESC). The project also includes the design and removal of various underground runs of 15KV PILC cable and replacing them with 15KV EPR type cable (less than 2500 linear feet), and removing Load Break Switches (LBS's) 40, 41, 42, and 43. Provide the design and installation of new 15KV fuse cutouts to refeed transformers SS 192, SS107, and SS195. The total power line length is approximately 4.1 miles and runs the entire length of Static Test Road (located on the east side of the road about 25' away from the pavement). The total number of wooden poles to be removed is approximately 148 (to be verified during design). The Period of Performance (PoP) for the construction effort is 490 Calendar Days from Notice to Proceed (NTP). Questions or comments regarding this solicitation must be submitted via email, cite the solicitation number (80KSC024R0003), and be directed to the following Government representatives. Name: LaCorsha Whitmore Noel / Randall Gumke Email: Lacorsha.d.noel@nasa.gov / Randall.a.gumke@nasa.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects