Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 1, 2025

September 30, 2026

To Be Determined

New Construction, Site Work

No Information to Display

$9,500,000.00

Public - County

img_map_placeholder

To Be Determined, Orlando, FL

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Major elements of the project include: 1. A new Northeast Maintenance Ancillary Facility, approximately 21,000 square feet, which will house the northeast maintenance management team on 12 +/-acres. 2. The Northeast Maintenance Ancillary Facility will include a white fleet, office space for 20-30 staff, warehouse for storage and light repairs. Parking at the facility shall accommodate approximately 100 spaces for personal vehicles and 100 spaces for service vehicles. 3. Site improvements, including but not limited to grading, drainage, retaining walls, underground utilities, stormwater retention, etc. required in support of the new facility. The selected site will be unoccupied during construction. Due to the complexity and variety of scope items, preference will be given to a Prime with Architectural experience. Question End Date 10/27/2023 2:00 PM Target Schedule: Design/Pre-construction Services Commencement: April 2024 Construction Notice to Proceed: July 2025 Substantial Completion: September 2026 The method of Contractor Selection has not been Determined at this time.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects