Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

January 1, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$5,000,000.00

Public - Federal

img_map_placeholder

Multiple Locations, Gorham, ND

Subscribe to View Full Documents

ND FLAP 704(1) & 795(1) The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA), in cooperation with Billings County and U.S. Forest Service (USFS), are proposing construction of ND FLAP 704(1) and 795(1) Magpie and Whitetail Crossings, to provide safe travel and allow consistent access across Magpie Creek (Magpie Road) and Whitetail Creek (Whitetail Road). The existing routes have informal low water crossings with negligible hardened surfacing which are in poor condition and are impassable during storm events. OF THE WORK: The of this project will include the construction of structures across Magpie Creek and Whitetail Creek to allow the passage of vehicles. Work will also include roadway work for the stream crossing approaches as appropriate. The Magpie Crossing will include the replacement of the existing low water crossing with a multi-span bridge structure over Magpie Creek. It will also include adjacent roadway reconstruction leading up to the bridge structure including gravel surfacing. The Whitetail Crossing will include removal and replacement of the existing low water crossing to include an AOP precast reinforced box culvert structure including approach work; and roadway reconstruction including sight distance improvements and gravel surfacing. The crossing will straighten the roadway through this section leading up to the Whitetail Picnic Area TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 4 P.M. ON OCTOBER 26, 2023 Questions can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at https://sam.gov ESTIMATED PRICE: The price range of the project work is between $2,000,000 and $5,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects