Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

October 16, 2023

August 16, 2024

22212 Brookhurst St

Renovation

No Information to Display

$205,402.00

Public - County

img_map_placeholder

22212 Brookhurst St, Huntington Beach, CA

Subscribe to View Full Documents

Online Q&A Yes The Orange County Sanitation District invites qualified contractors to replace the air compressor system at Plant 2. Must meet one of the following restrictions: CADIR - Registered DIR Public Works Contractor This Scope of Work (SOW) defines the requirements for the work at Plant 2 Central Generation (Cen Gen) Facilities Building to replace the legacy instrument air compressor system and related appurtenances. This work includes the removal of the existing instrument air compressors and installation of a new in-kind replacement instrument air compressor system including associated piping; valves;instruments, controls; appurtenances; and testing, placement into operation, commissioning, and training requirements as defined herein. The Contractor shall furnish all labor, equipment, materials, machinery, tools, supplies, insurance, permits, licenses, transportation, and other incidentals necessary to complete all tasks and items of work described within the Attachments and other portions of this SOW. The Contractor shall complete the following tasks: Submit procurement documents Submit product submittals Submit work plan incorporating all OC SAN comments Submit project schedule Demolition of the legacy compressor system Prepare drawings Fabricate the new air compressor system Repair the equipment concrete foundation and anchor bolt system and, install anchor bolts Install the new compressors on existing or modified foundations as required Perform factory and field testing on the new compressor system and appurtenances Test and commission the complete system Provide training of OC San staff on system operation and maintenance Question Deadline 07/21/2023 at 2:00 PM PT

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects