Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 2, 2025

No Information to Display

16700 Franklin Rd

Addition, Demolition, Renovation

No Information to Display

$10,000,000.00

Public - City

img_map_placeholder

16700 Franklin Rd, Northville, MI

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Project work includes: New Construction/Space Renovation STEAM Addition Circulation alignment between academic pods New entry canopy New collaboration spaces and upgraded exterior learning infrastructure Architectural Work Additional windows in classrooms Locker replacement Band/Choir/Orchestra remodeling and upgrades Major remodeling of kitchen and cafeteria Gym floor refinishing Locker room updates Replacement of select aging doors, millwork and hardware Replace exterior doors where necessary Replace select interior finishes as needed Roofing/Building Envelope Replace roofing Mechanical Systems and Energy Efficiency Upgrades Comprehensive HVAC equipment replacement and indoor air quality improvements Exhaust Fans, Unit Heater equipment replacement Water Heater Replacement Electrical and Energy Efficiency Upgrades LED lighting upgrades Electrical panel board replacement Electrical motor control center replacement Electrical updates to emergency lights, added classroom outlets, new GFCI outlets in existing areas near sinks Site Improvements Replace select areas of parking lots Replace select concrete sidewalks, stairs and ramps Storm sewer rework, fencing and gate replacement As of September 24, 2024, this project is in the pre-construction phase. The bond has been approved. An architect and construction manager have been selected for the project. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2026. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.