Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

February 2, 2026

No Information to Display

45700 Six Mile Rd

Addition, Demolition, Renovation

No Information to Display

$10,000,000.00

Public - City

img_map_placeholder

45700 Six Mile Rd, Northville, MI

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Project work includes: New Construction/Space Renovation STEAM Addition Natatorium Remodeling New collaboration spaces and upgraded exterior learning infrastructure Architectural Work Replace classroom and corridor flooring and finishes Replace art room casework Replacement of select aging doors, millwork and hardware Replace exterior doors where necessary Replace select interior finishes as needed Gymnasium bleacher replacement Bathroom upgrades Kitchen equipment upgrades Auditorium Lighting upgrades Sound system upgrades Replace interior Finishes Natatorium Timing and scoring equipment replacement Diving and starting block replacement Locker room renovation Pumping system replacement Select pool tank and deck tile replacement Building Systems Elevator system, wheelchair lift and clock system replacement Mechanical Systems and Energy Efficiency Upgrades Upgrade and recondition HVAC equipment and indoor air quality improvements Redesign of academic wing HVAC systems Boiler replacement Pumping plant replacement Accessory ventilation equipment replacement Exhaust fans, unit heater equipment replacement Fire sprinkler pump replacement As of September 24, 2024, this project is in the pre-construction phase. The bond has been approved. An architect and construction manager have been selected for the project. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2026. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.