Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 11, 2023

December 5, 2023

No Information to Display

121 Roberta Dr

Renovation

No Information to Display

$400,000.00

Public - County

img_map_placeholder

121 Roberta Dr, Barnesville, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

**As of August 21, 2023 bids were rejected. No definite date for the rebid.** All questions concerning this RFP must be submitted in writing (email is preferred, but fax and mail may be used) to the Lamar County Board of Commissioners Office no later than 12:00 PM on June 16, 2023, local time. The County reserves the right to reject the submittal of any bidder violating this provision. Bonds 5% of the total bid amount Performance Bonds 100% of total contract price (required of awarded vendor only) Payment Bonds 100% of total contract price (required of the awarded vendor only) All questions concerning this RFP must be submitted in writing (email is preferred, but fax and mail may be used) to the Lamar County Board of Commissioners Office no later than 12:00 PM on June 16, 2023, local time. The Inquiries must be directed to: Sean Townsend, County Administrator Lamar County Board of Commissioners 408 Thomaston Street, Suite E Barnesville, GA 30204 stownsend@lamarcountyga.com (770) 358-5146 EXT 109 SCOPE OF WORK Re-roofing: a. Work will consist of replacing the existing roof on sections "D" and "E" of the jail and installing a new insulated single ply TPO membrane system over the existing concrete deck per these specifications. See detail #1 ( Roof Sketch ) for location of roofs to be replaced. Repairs: a. Included in the scope of work will be repairs to the existing metal roofs on sections A and B, and repairs to the small built up roof on section C. See roof sketch for location of these roofs. 7-02 NEW ROOF SYSTEM: a. The new roof system for roofs "D" and "E" are to be a fully adhered .060 TPO membrane system installed over polyisocyanurate insulation. b.The following publications and guidelines form a part of these specifications: 1. ASCE 7-10 wind load requirements for the Barnesville, Georgia area. 2. FM Approvals: Roof Nav Approved Roofing Assemblies and Products 4470-10------------------- Approved Standard For Class 1 Roof Coverings I-28-09------------------- Loss Prevention Data Sheet: Design Wind Loads I-29-09-------------------- Loss Prevention Data Sheet: Above Deck Roof Components I-49-09-------------------- Loss Prevention Data Sheet: Perimeter Flashing 3. National Roofing Contractors Association: Roofing & Waterproofing Manual 4. American National Standard Institute/ Single Ply Roofing Institute ( ANSI/SPRI ) ANSI/SPRI FX-1-01

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.