Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 12, 2023

September 11, 2023

June 28, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$1,908,849.00

Public - County

img_map_placeholder

Multiple Locations, Canandaigua, NY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Work under this Contract consists of the replacement of the Tileyard Road over Flint Creek Bridge (BIN 3318320) in the Town of Gorham, Ontario County, New York. The work includes removal of the existing steel multi-girder bridge, excavation, construction of a new steel multi girder bridge, construction of integral abutments and wing walls supported on piles, reconstruction of the highway, back fill and slope regrading, installation of bridge railing and box-beam guide railing, placement of stone fill and other incidental construction necessary for completion of the project. Checks shall be made payable to the Ontario County Treasurer. No bidder shall receive documents prior to receipt of a deposit by the Purchasing Department. No bids shall be accepted from a vendor not submitting a deposit. Bidders requesting arrangements other than U.S. Mail shall be responsible for making such arrangements and all associated costs. Deposits must be a check or cash, no credit cards are accepted or copies of checks. Each bid shall include Bid security in the amount of five (5%) percent of the total bid offered by the bidder. Said bid security shall be in the form of a certified check, bond, or irrevocable line of credit and is required to be included with the bid submittal. Note: The County of Ontario shall not be held responsible for the completeness or accuracy of any bid documents received by a bidder that were not directly issued to that bidder by the Ontario County Purchasing Department. Any bidder submitting a bid based on incomplete or inaccurate information resulting from documentation received from any third party shall not have cause for relief from award or completion of a contract in accordance with the official documents on file with the Ontario County Purchasing Department. It is HIGHLY suggested that all bidders interested in participating in this bid, contact the Ontario County Purchasing Department directly at the above address or telephone number to assure they have received the most accurate and up to date material concerning this contract. Amendments to the bid documents will be issued from the Purchasing Department to plan holders via email and uploaded to the bid information webpage. The County does not offer or supply anyone the list of people that have obtained a copy of these bid specifications or cost estimates for the project prior to the opening of the bid. NO EXCEPTIONS ARE MADE TO THIS POLICY. This project includes a 5% DBE Participation Goal. There is also a EEO goals for Women (6.9%) and Minorities (5.3%). There are no M/WBE or SDVOB goals for this project. There are no residence or geographical restrictions. Ontario County reserves the right to reject any or all bids. Location: BIN 3318320, P.I.N. 4ON0.06 D040166 Town of Gorham Price: $100 hard copy/ $50 electronic Set Includes: One Book One set of drawings Documents are available electronically to planholders Project Scope Work under this Contract consists of the replacement of the Tileyard Road over Flint Creek Bridge (BIN 3318320) in the Town of Gorham, Ontario County, New York. The work includes removal of the existing steel multi-girder bridge, excavation, construction of a new steel multigirder bridge, construction of integral abutments and wingwalls supported on piles, reconstruction of the highway, backfill and slope regrading, installation of bridge railing and box-beam guide railing, placement of stone fill and other incidental construction necessary for completion of the project. Substantial Completion by June 28, 2024 Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 5.3% Women Owned Sub-Contracting Goal: 6.9% Disadvantaged Owned Sub-Contracting Goal: 5% Bids are required to be in a sealed envelope Contract term: Until Complete County(ies): Ontario Location: Tileyard Road, Town of Gorham over Flint Creek Business entities awarded an identical or substantially similar procurement contract within the past five years: none

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.