Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 14, 2023

August 14, 2023

September 30, 2023

1001 South 336th St

Renovation

No Information to Display

$247,822.00

Public - County

img_map_placeholder

1001 South 336th St, Federal Way, WA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Any questions or requests for further information or clarification must be directed to, Jesse Bennett, JesseB@kcha.org (206) 214-1258, Multifamily Weatherization Construction Project Manager, and CC EnergyConservation@kcha.org, no later than noon on 7/7/2023. Replace the existing five (5) two ton ducted heat pump Replace the existing one (1) three ton ducted heat pump Replace the existing one (1) four ton ducted heat pump Replace line set for two ton ducted heat pump in the lower attic Replace line set for two ton ducted heat pump in upper attics Replace line set for three ton ducted heat pump in upper attic Replace line set for four ton ducted heat pump in upper attic Install seven (7) new ERVs to work with the new heat pump air handler units in attics and any required controls or dampers to balance and set the ERV to meet ASHRAE 62.1 for the area the ERV serves. AeroSeal all ducting associated with ducted heat pumps & ERVs Alternate 1 I. Replace the existing two (2) two ton, wall mounted single headed ductless split system II. Replace line set for two ton, wall mounted single headed ductless split system III. Replace existing thermostats with new thermostats in protective covers

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.