Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
June 21, 2023
October 25, 2023
November 1, 2023
1100 North Ave
Site Work
No Information to Display
$1,600,000.00
Public - State/Provincial
1100 North Ave, Grand Junction, CO
Reference Number 0000322241 The State of Colorado acting by and through the Board of Trustees of Colorado Mesa University for the use and benefit of Colorado Mesa University, is seeking submittals from qualified utility contractors interested in providing construction services for the CMU Geo Exchange Extension; CP-6 Geo Borefield. The Drilling/Looping Contractor (D/L Contractor) shall provide a complete Geothermal Loop Heat Exchanger (GLHE) as shown on the drawings. The GLHE is a closed vertical loop consisting of sixty-six (66) boreholes, five hundred (500) feet deep each. Boreholes are headered into groups of four or six, creating a circuit; three circuits are headered together to form a subfield. These subfields are designated as Subfields A through D. The subfield supply and return lines are piped to the existing vault as shown on the drawing. Time and construction space are critical on this job. Subfields must be drilled and headered in a sequence determined by the General Contractor. Unless otherwise instructed by the Owner's Representative or Architect's Engineer, all subfields will be fully completed prior to moving to the next subfield. The plans require drilling 33,000 feet of new borehole and the emplacement of 66,000 feet of new heat exchanger piping in the 66 new boreholes. The completed depth shall be determined by the placement of the U-bend. The distance from the bottom of the U-bend to final grade shall constitute the completed bore depth. Supply and install all piping and fittings as shown in the drawings. Supply and install new manifold and valves in the existing vault as shown on the drawings. Refer to drawings and specifications fully. Work included in this Contract shall be completed while Colorado Mesa University is out of session for the Summer Break. Said break extends from May 30th to August 15th. General Requirements - Contractors License Required - Installation Required - Insurance Required - License Required - Onsite Maintenance Required - Prevailing Wage Required Question Acceptance Deadline 06/15/2023 01:00 AM EDT Questions are submitted online No
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Grand Junction, CO
Bid Date: Sep 20 2023
Grand Junction, CO
Bid Date: Jan 31 2024
Grand Junction, CO
Bid Date: Dec 22 2023
Grand Junction, CO
Bid Date: Jan 15 2024
Grand Junction, CO
Bid Date: Jan 31 2024
Grand Junction, CO
Bid Date: Jan 31 2024
Grand Junction, CO
Bid Date: Oct 15 2024
Grand Junction, CO
Bid Date: Sep 30 2024
Grand Junction, CO
Bid Date: Nov 02 2023
Grand Junction, CO
Bid Date: Mar 09 2023
Grand Junction, CO
Bid Date: Nov 17 2023
Grand Junction, CO
Bid Date: Nov 02 2023
Grand Junction, CO
Bid Date: Nov 06 2023
Grand Junction, CO
Bid Date: Nov 15 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
