Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

November 18, 2024

No Information to Display

2145 River Road

Addition, Demolition, Site Work

No Information to Display

$76,700,000.00

Public - City

img_map_placeholder

2145 River Road, Grand Junction, CO

Subscribe to View Full Documents

90% Design (GMP) A Construction Manager has been selected. 1. Improvements to the existing Headworks Building including: a. Replacement of screens, screenings conveyor(s), and screenings compactors. b. Replacement of grit concentrator and classifier equipment. c. Installation of grit concentrator and classifier organic waste line. d. Replacement of grit piping and grit pumps. e. Installation of two actuators on existing slide gates. f. Building modifications including replacement of HVAC and floor drains. 2. Improvements to the aerobic basins (A-basins), including: a. Two new A-basins. b. New blower building with new blowers for all A-basins. c. Extension of pipe gallery. d. New RAS pumps. e. New Mixed Liquor Return (MLR) pumps. f. Installation of anoxic zone baffle walls in existing A-basins. 3. Improvements to the existing UV structure including: a. Installation of new UV equipment including associated channel modifications. b. Installation of gates in UV channels. c. Installation of a new canopy over UV structure. 4. Installation of new dewatering building including: a. New sludge blending tank. b. Centrifuges and centrifuge feed equipment (pumps, grinders, and polymer mixing and feed equipment). c. Dewatered cake conveyor. d. Truck scale. e. Centrate piping and pumping station. f. Covered biosolids storage area. 5. Improvements to yard piping and hydraulic control structures, including: a. Raising the walls of Control Structure No. 1. b. Adding splitter elements to Control Structure No. 2. c. Installation of influent piping to new A-basins and new effluent piping from new A-basins. d. Installation of plant water, potable water, and domestic sewer piping as required for service to the new structures.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects