Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 12, 2023

June 12, 2023

July 5, 2024

305 Huguelet Dr

Renovation

No Information to Display

$2,342,062.00

Public - State/Provincial

img_map_placeholder

305 Huguelet Dr, Lexington, KY

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The University of Kentucky, Construction Procurement Section, reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the University may be served. No bidder may withdraw his bid for a period of sixty (60) days after the date set for the opening of bids. Clerical errors and omissions in the computation of the lump sum shall not be cause for withdrawal of the bid without forfeiture of bid bond. Bids may be withdrawn in person only, prior to the closing date for receipt of bids. All bids shall be accompanied by a bid guarantee of not less than five (5%) percent of the amount of the base bid. A 100% Performance Bond and 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instruction to Bidders, General Conditions and Special Conditions. The University of Kentucky "Improve Jacobs Science Building" project will include fit-out of approximately 34,000 gross square feet of space within Don & Cathy Jacobs Science Building. The project will transform shelled space to include classroom fit ups on the first and second floor and research lab space on the 3rd floor as well as associated HVAC work to accommodate lab space. This is a re-bid for the electrical package only Final award of Contract will be made on the basis of the lowest, responsive and responsible bid which offers the best value The time for Substantial Completion as further defined in Article 1 of the General Conditions shall be on or before July 5, 2024, as specified in the Work Order letter, and Final Completion shall be Thirty (30) consecutive calendar days thereafter No pre-bid meeting will be held for this package. No questions will be accepted for this package

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects