Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 23, 2023

October 23, 2023

May 16, 2025

610 Main St

Renovation

No Information to Display

$30,000,000.00

Public - City

img_map_placeholder

610 Main St, Fitchburg, MA

Subscribe to View Full Documents

A Request for Qualifications (RFQ) is the first phase of a two-phase procurement process as set forth in MGL c. 149. The Prequalification Committee will prequalify firms through this RFQ process. The Committee will evaluate submitted SOQs based upon the identified evaluation criteria and will select those respondents it deems qualified. Only those respondents deemed qualified will be invited to submit in response to a bid which will be issued in the second phase of the procurement process. The project delivery method for construction will be design-bid-build. The project team includes the Awarding Authority, Colliers Project Leaders serving as OPM, and Tappe Architecture serving as design firm. The Project consists of abatement and partial demolition of the existing Fitchburg Public Library building, followed by the construction of a new, 2 story, 25,300SF Library addition and the renovation of 29,700SF of existing Library building. The new building will contain book stacks/collections, offices, a small Cafe Space, Media and Art gallery spaces, a new large meeting room/presentation space, and a variety of other spaces in support of the Library's program and operations. Sitework will include regrading, new parking areas, driveways, walkways, and plantings and extends as required to make the needed utility connections (gas, electric, water, sewer) as shown on the plans. Elevator Filed Subcontractors interested in being prequalified must demonstrate prior experience as a subcontractor with projects of a similar size, complexity, and type as this project. At the time a filed subcontractor submits an SOQ it must hold DCAMM Certification in the correct category. The successful respondent must be able to obtain bonding for the full construction cost. Women and Minority Business participation and minority work force goals will apply to this project. A more detailed description of the project, along the prequalification evaluation criteria and detailed selection process is included in the full procurement documents.

44 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.