Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 16, 2023

July 10, 2023

August 11, 2028

100 Stellarator Rd

Renovation

No Information to Display

$10,000,000.00

Public - Federal

img_map_placeholder

100 Stellarator Rd, Princeton, NJ

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Trustees of Princeton University, a U.S. Department of Energy Prime Contractor, represented by Princeton Plasma Physics Laboratory (PPPL) wishes to solicit proposals in response to Request for Proposal (RFP) 23-002C for Construction Manager/General Contractor (CM/GC) Services for the constructionis of the Critical Infrastructure Recovery & Renewal (CIRR) Project located at Princeton Plasma Physics Laboratory, 100 Stellarator Road, James Forrestal Campus, US Route 1 North, Princeton, NJ. Princeton Plasma Physics Laboratory (PPPL) has developed a long-term initiative to make mission critical improvements to offices and lab facilities. These improvements are needed to support PPPL's unique and distinct competencies and close existing capability gaps that support the laboratory programs. The Critical Infrastructure Recovery and Renewal (CIRR) project was developed under this long-term initiative to replace old degraded systems and make critical repairs, replacements, and modernize several critical infrastructure systems such as: 1. Chilled Water Generation 2. Communications Distribution Network 3. Electrical Distribution and Standby Power 4. HVAC Systems 5. Underground Distribution Network The scope of work consists of three phases: Phase 1 (Base Requirement) - The Subcontractor will provide Construction Management (CM) Pre-construction Services in cooperation and collaboration with the PPIC Project Team and the Architect-Engineer Subcontractor. Phase 2 (Option 1) - Long Lead Equipment Purchase. Phase 3 (Option 2) - Construction of critical infrastructure systems. The magnitude of this procurement exceeds $10 million inclusive of the option items. The period of performance is: Phase 1 - Q4 FY23 through Q1 FY25 (490 calendar days) Phase 2 (Option 1) - Q4 FY24 through Q1 FY26 (550 calendar days) Phase 3 (Option 2) - Q2 FY25 through Q2 FY27 (820 calendar days) The applicable NAICS code is 236220, Commercial and Institutional Building construction. The procurement is unrestricted (full and open competition). The full RFP may be reviewed and downloaded, by clicking on the "Procurement Opportunities" link and then on the appropriate RFP link. Click on RFP 23-002C and download and save the file to your computer. Open to view the RFP documents using the latest version of Adobe Reader. You will not be able to view the documents using your internet browser. This announcement shall not commit PPPL to issue a subcontract for this effort, or to pay any costs incurred by offerors in the preparation and submittal of proposals in response to this RFP.

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.