Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 30, 2023

September 22, 2023

November 10, 2023

6720 SE Delaware Ave

Site Work

No Information to Display

$241,500.00

Public - City

img_map_placeholder

6720 SE Delaware Ave, Ankeny, IA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Delaware Ground Storage Rehabilitation project includes abrasive blast cleaning the reservoir exterior to an SSPC-SP6 commercial standard with containment and the application of a four (4) coat zinc epoxy urethane fluoropolymer system, along with abrasive blast cleaning and application of a two (2) coat epoxy system to the reservoir foundation, and the installation of an impressed current cathodic protection system and associated coating repairs to the wet interior. Other repairs consist of the installation of a sidewall manway, gasket on the wet interior roof hatch, deflector bar on the fill/draw pipe, overflow discharge modification, sidewall platform with vandal guard, pressure vacuum vent, roof handrail with painters rail and sample tap. The Delaware Ground Storage Reservoir is 500,000 gallons with an approximate sidewall height of thirty-two (32) feet and diameter of approximately fifty (50) feet located at 6720 SE Delaware Ave in Ankeny, Iowa. The Contractor shall fully complete the overall project by October 20, 2023. The project shall be considered fully complete when the tank is, or would have been returned to service, except for voluntary delay by the City. Date of completion is after complete cure, disinfection, and testing. Should the Contractor fail to fully complete the work in this timeframe, liquidated damages of One Thousand Two Hundred Fifty dollars ($1250) per calendar day will be assessed for work not fully completed within the designated Contract term(s). The City of Ankeny does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

36 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.