Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

April 15, 2024

June 24, 2024

SE 54th St & SE Delaware Ave

Paving, Site Work

No Information to Display

$625,446.00

Public - City

img_map_placeholder

SE 54th St & SE Delaware Ave, Ankeny, IA

Subscribe to View Full Documents

SE Delaware Avenue and SE 54th Street Traffic Signal Est. Value: $ 625,446.00 The SE Delaware Avenue and SE 54th Street Traffic Signal project includes installing a traffic signal at the intersection, installing conduit and fiber optic cable to the next intersections to the north and south, constructing an apron for a future east leg to the edge of existing right-of-way, constructing sidewalk modifications for ADA compliance, installing pavement markings, and constructing median nose modifications. The construction improvements include constructing a new traffic signal, approximately 480 SY of 10.5" thick PCC Class C-SUD street pavement, 110 SY of 5" thick PCC sidewalk, 60 SY of 6" thick PCC sidewalk, with Class 10 excavation, subgrade preparation, modified subbase, pavement markings, installing 6,680 LF of fiber optic cable, 3,630 LF of 2" conduit for fiber optic cable, fiber optic equipment and splices, temporary traffic control, erosion control, completing final surface restoration, and miscellaneous associated work necessary to complete the project. The Contractor shall substantially complete the overall project within sixty (60) working days. Substantial completion for the overall project shall be defined as all utility, grading, pavement, and traffic signal construction completed, with the new pavement markings, and the new streets, driveways, and sidewalks fully open to traffic and the new traffic signal fully operational. Should the Contractor fail to substantially complete the work in this timeframe, liquidated damages of One Thousand Dollars ($1,000.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). The Contractor shall fully complete the overall project within ten (10) working days commencing on a mutually agreed upon date following substantial completion of the overall project. Full completion for the overall project shall be defined as all work including surface restoration and punch list items completed, and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work in this timeframe, liquidated damages of Five Hundred ($500.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s).

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.