Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 4, 2023

October 4, 2023

March 11, 2024

1400 Rodd St

Site Work

No Information to Display

$100,000.00

Public - City

img_map_placeholder

1400 Rodd St, Midland, MI

Subscribe to View Full Documents

SCOPE: The scope of work must include but is not limited to: removing fencing, and replacing with new fencing per drawings. Contractors Qualifications Contractor must have five years of experience in fence installation with 25 jobs or more of similar or larger size over the past five years. If the successful contractor has not performed services for the district in the previous three years, they must submit a reference list including contact names and phone numbers. Guarantee 1. All supplies materials and equipment used in the performance of the bid shall be of the type and quality used in commercial chain-link fence replacement services 9 gauge x 2" mesh. 2. Post spacing shall be spaced a maximum of 10'0" on center, Terminal spans may be less in order to adjust line spans or even footage. 3. Post Settings - all end & gate posts shall be set in concrete to the appropriate frost line depth with a belled bottom and concrete kept 3" below grade for backfill material; all line posts shall be driven unless approved by District. HF40 round tube/pipe should be used. 4. Fittings - all fittings and hardware shall be steel and of commercial grade/appropriate for use with zinc coated steel fabric or as appropriate if other fabric is specified. 5. Fabric Ties - steel fabric ties must be utilized in all applications unless approved by District. 6. Fence Removal - when removing fence posts the Contractor shall completely move the post and any concrete and completely fill and compact the holes with appropriate soil so that the area is level with the adjacent ground/surface. The Contractor shall not fill the post holes with the concrete removed from the old posts. 7. Backstops should match the width of the original and have a height of 20' with a full 6' canopy when specified. The backstop should be 6 gauge galvanized and the top section 9 gauge galvanized. 8. Safety capping on replaced fencing should be replaced with new to match existing.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.