Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
September 4, 2023
October 4, 2023
March 11, 2024
1400 Rodd St
Site Work
No Information to Display
$100,000.00
Public - City
1400 Rodd St, Midland, MI
SCOPE: The scope of work must include but is not limited to: removing fencing, and replacing with new fencing per drawings. Contractors Qualifications Contractor must have five years of experience in fence installation with 25 jobs or more of similar or larger size over the past five years. If the successful contractor has not performed services for the district in the previous three years, they must submit a reference list including contact names and phone numbers. Guarantee 1. All supplies materials and equipment used in the performance of the bid shall be of the type and quality used in commercial chain-link fence replacement services 9 gauge x 2" mesh. 2. Post spacing shall be spaced a maximum of 10'0" on center, Terminal spans may be less in order to adjust line spans or even footage. 3. Post Settings - all end & gate posts shall be set in concrete to the appropriate frost line depth with a belled bottom and concrete kept 3" below grade for backfill material; all line posts shall be driven unless approved by District. HF40 round tube/pipe should be used. 4. Fittings - all fittings and hardware shall be steel and of commercial grade/appropriate for use with zinc coated steel fabric or as appropriate if other fabric is specified. 5. Fabric Ties - steel fabric ties must be utilized in all applications unless approved by District. 6. Fence Removal - when removing fence posts the Contractor shall completely move the post and any concrete and completely fill and compact the holes with appropriate soil so that the area is level with the adjacent ground/surface. The Contractor shall not fill the post holes with the concrete removed from the old posts. 7. Backstops should match the width of the original and have a height of 20' with a full 6' canopy when specified. The backstop should be 6 gauge galvanized and the top section 9 gauge galvanized. 8. Safety capping on replaced fencing should be replaced with new to match existing.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Midland, MI
Bid Date: Aug 29 2023
Midland, MI
Bid Date: Aug 29 2023
Midland, MI
Bid Date: Sep 12 2023
Midland, MI
Bid Date: Oct 31 2023
Midland, MI
Bid Date: Nov 03 2023
Midland, MI
Bid Date: Oct 30 2023
Midland, MI
Bid Date: Oct 24 2023
Midland, MI
Bid Date: Sep 26 2023
Midland, MI
Bid Date: Aug 29 2023
Midland, MI
Bid Date: Jul 31 2023
Midland, MI
Bid Date: Aug 30 2023
Midland, MI
Bid Date: Aug 01 2023
Midland, MI
Bid Date: Aug 15 2023
Midland, MI
Bid Date: Aug 15 2023
Midland, MI
Bid Date: Jul 11 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
