Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

November 17, 2023

No Information to Display

Multiple Locations

Site Work

No Information to Display

$1,092,048.00

Public - City

img_map_placeholder

Multiple Locations, Williston, SC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Installation of 750-gpm water filtration system including site work, concrete pad, canopy (Add Alternate), backwash holding tank, 915 linear feet of gravity sewer, electrical, fencing and appurtenances Time allotted for construction is 360 consecutive calendar days for substantial and final completion. Consideration will be given for issuing the Notice to Proceed based upon anticipated delivery of materials. Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. This is a Section 3 Covered Project under the HUD Act of 1968 and Section 3 Residents and Business Concerns are encouraged to apply. The OWNER is committed to providing all persons with equal access to its services, programs, activities, education, and employment regardless of race, color, national origin, religion, sex, familial status, disability or age All Bidders must have a State of South Carolina Contractors WL4, WP4 or higher License No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for a period of ninety (90) days All proposals shall be accompanied by a Bid Bond drawn in favor of the Town of Williston, in the amount of at least 10% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the Town of Williston. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the Town of Williston as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract. Upon receipt of all documents in undamaged condition within 30 days after the date of opening of bids, half of the deposit will be refunded. The Owner reserves the right to reject any or all bids and to waive informalities

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects