Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 17, 2023

July 17, 2023

May 16, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$13,751,577.00

Public - City

img_map_placeholder

Multiple Locations, Seattle, WA

Subscribe to View Full Documents

With the support of the mayor and City Council, the City of Seattle administers programs that support racial and economic equity through contracting. Priority Hire is one of these programs. Priority Hire provides people living in economically distressed communities, women, and people of color access to work on the city's construction projects. It gives contractors access to these skilled workers. Project Location: Pioneer Square. Bounded by Yesler Way on the north, S. King St. on the south, Alaskan Way on the west and 2nd Ave. S. on the east. The project goals of Pioneer Square East-West Streets Pedestrian Improvements are to construct roadway and pedestrian improvements on portions of Main, Washington, King and Yesler Streets between 2nd Avenue and Alaskan Way in Downtown Seattle. The work includes widening the existing sidewalk and repaving portions of the sidewalk and roadway along with irrigation, landscape and site furnishings for the pedestrians. In addition, vehicular traffic flow through the project will be revised to create more space for pedestrian access and improve the pedestrian realm. Other elements of the work include curb ramps, structural supports for curb ramps at areaways, storm drainage, sanitary sewer, and water improvements as well as signage and channelization. Additive: This work includes all equipment, labor, and materials required to remove existing improvements at the intersection of S. Main Street and Alaskan Way and install new paving, plantings, and irrigation as shown on the Drawings A/E Estimate Base Bid: $8,350,000 to $9,750,000. A/E Estimate Additive 1: $60,000 to $80,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. For purposes of the Inclusion Plan, this is considered a Roadway type of project with a Past Performance of 19 Percent WMBE utilization rates based on completed projects. For questions on the Inclusion Plan please contact Miguel Beltran at Miguel.beltran@seattle.gov or 206-684-4525. Back-up contact is Carmen Kucinski. at carmen. kucinski@seattle.gov or 206-684- 0188. Questions must be emailed by 5:00pm, 3 Business Days before Bid opening. All questions must be e-mailed and be directed to the following: Before Bid Opening: David Vijarro, PE Seattle Department of Transportation David.Vijarro@seattle.gov After Bid Opening and Before Execution: Purchasing and Contracting FAS_PW_Admin@seattle.gov 206-684-0444 After Execution: Jessica Murphy Seattle Department of Transportation Construction Program Manager Jessica.Murphy@Seattle.Gov 206-684-0178 Inclusion Plan: All questions on the Inclusion Plan must be directed to Miguel Beltran at Miguel.beltran@seattle.gov or 206-684-4525. Backup contact is Carmen Kucinski at carmen.kucinski@seattle.gov or 206-684-0188.

91 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.