Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 15, 2022

December 15, 2022

No Information to Display

255 High St

Renovation

No Information to Display

$270,118.00

Public - County

img_map_placeholder

255 High St, Eugene, OR

Subscribe to View Full Documents

Parkview Terrace Balcony Deck Recoating: Re-apply new traffic coating over areas with existing coating. This includes the upper floor balconies, stair treads, stair intermediate landings, and laundry rooms. Project will be constructed under a single prime contract. Limit use of Project site to areas within the site property lines. Do not disturb portions of Project site beyond areas in which the Work is indicated, except as needed to construct site utilities and sidewalks within the public right-of-way. 1. Driveways, Sidewalks and Alleys: Keep driveways, sidewalks and entrances serving adjacent premises clear and available to emergency vehicles at all times. Do not use these areas for parking or storage of materials. a. Schedule deliveries to minimize use of alleys by construction operations. b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site. Work Restrictions, General: Comply with restrictions on construction operations. 1. Comply with limitations on use of public streets and alleys and other requirements of authorities having jurisdiction. If contractor requires temporary use streets or alleys adjacent to site, Contractor to obtain all permits and approval from jurisdictions having authority. On-Site Work Hours: Limit work on the Project to normal business working hours of 7:00 a.m. to 6:00 p.m., Monday through Friday. Decks and stairs cannot be closed off on Thursdays or on the third Wednesday of the month. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated: 1. Notify Owner not less than seven days in advance of proposed utility interruptions. 2. Obtain Owner's written permission before proceeding with utility interruptions.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.