Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

June 1, 2024

August 31, 2024

1585 E 13th Ave

Renovation

No Information to Display

$1,450,000.00

Public - State/Provincial

img_map_placeholder

1585 E 13th Ave, Eugene, OR

Subscribe to View Full Documents

The Project includes: Phase 1 - Provide site demolition, construction, and installation of vaults, conduit duct banks and other site improvements necessary for the installation of two switches and cables in relation to the planned demolition of Hamilton Hall. Feeders will be rerouted to the new corresponding vaults. With the exception of miscellaneous landscaping, civil work will be completed before the arrival of the medium voltage switches. Outages shall be limited in duration, phased, and coordinated in advance of the UO to preferably take place during UO's summer vacation period. The utmost priority will be purchasing any long lead items (eg: switches, cabling, etc.) in order to have them available once the associated civil work has been completed. Phase 2 - Installation of two new MV switches on vaults V342 and V343. Installation to begin June 2024 finish by August 2024. Outages shall be coordinated in advance with UO. Scope of Work 2.1 The Work contemplated in this document shall be for the Owner in connection with the Project described in the Project Manual. A Bidder in doubt as to the meaning of any part of the Project Manual may submit a written request for an interpretation to the Architect Question Deadline 10/28/2023 Project located in the parking area north of Knight Law Center, area between the Museum of Natural and Cultural History, Global Scholars Hall through to Moss Street, west edge of Hamilton Hall, and Bean East and West, all on the University ofOregon campus, in Eugene, Oregon

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects