Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2022

November 11, 2022

March 3, 2023

SW Roxbury St & Olson Pl SW

Paving, Site Work

No Information to Display

$2,261,749.00

Public - City

img_map_placeholder

SW Roxbury St & Olson Pl SW, White Center, WA

Subscribe to View Full Documents

This project has been awarded to CA Carey Corp. A/E ESTIMATE: $1,650,000 to $1,850,000. This project is located at the intersection of SW Roxbury St & Olson Place SW & 4th Ave SW. The signal rebuild includes roadway work and removal and replacement of concrete panels. Project also includes installation of curb bulbs, ADA compliant curb ramps, sidewalk, paint striping and drainage improvements. For the purpose of the Bidder/Subcontractor List this project includes rebar installation and electrical work. This Contract will be administered by the Director of the Seattle Department of Transportation, subject to the approval and acceptance of the Director of Finance and Administrative Services. All questions must be e-mailed and be directed to the following Kari Frizzell Seattle Department of Transportation kari.frizzell@seattle.gov Purchasing and Contracting FAS_PW_Admin@seattle.gov 206-684-0444 Mark Sliger Seattle Department of Transportation Construction Management Mark.Sliger@Seattle.Gov 206-733-9936 For purposes of the Inclusion Plan, this is considered a Roadway type of project with a Past Performance of 19 Percent WMBE utilization rates based on completed projects All questions on the Inclusion Plan must be directed to Miguel Beltran at Miguel.beltran@seattle.gov or 206-684-4525. Backup contact is Carmen Kucinski at carmen.kucinski@seattle.gov or 206-684-0188. Work must begin immediately on the Notice To Proceed Date in the Written Notice from the Engineer and after the date of such notice must be physically completed within the following period per Section 3 of the Agreement: 80 WORKING DAYS If the successful Contractor fails to complete Work within the time set forth above, (s)he will be charged Liquidated Damages per Section 4 of the Agreement and Section 1-08.9. See Section 1-08.9 for method for determining cost of liquidated damages. Refer to Section 1-02.4(2) for information about any geotechnical or environmental reports, soil boring data, soil sample test data, or other data accumulated by the Engineer. Signal rebuild includes roadway work and removal and replacement of concrete panels. Project also includes installation of curb bulbs, ADA compliant curb ramps, sidewalk, paint striping and drainage improvements. For the purpose of the Bidder/Subcontractor List this project includes rebar installation and electrical work.

44 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.