Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 25, 2023

October 17, 2023

October 16, 2024

74485 National Park Dr

New Construction, Site Work

No Information to Display

$10,000,000.00

Public - Federal

img_map_placeholder

74485 National Park Dr, Twentynine Palms, CA

Subscribe to View Full Documents

CONSTRUCT NEW ENTRANCE STATION TO REDUCE TRAFFIC AND PROVIDE A SAFER WORKING ENVIRONMENT, JOSHUA TREE NATIONAL PARK, SAN BERNARDINO COUNTY, CALIFORNIA The National Park Service, Joshua Tree National Park, has a requirement to construct a new entrance station. The work consists of but is not limited to the following: 1. Site Work and Utilities, 2. Support building, 3. Kiosk 1 through 4, 4. Shade Canopies 1 and 2, 5. Power Generation and Storage System, 6. Telecommunication & Security Systems Infrastructure. The contractor shall provide all labor, materials, tools, equipment, and incidentals necessary to successfully complete the project. The project also includes three (3) option CLINs. The National Park Service reserves the right to unilaterally exercise the options at the date of award. Per the requirements of FAR 36.204, the project magnitude of this requirement is between $5,000,000 and $10,000,000. The North American Industry Classification System (NAICS) Codes for this requirement is 236220, with a corresponding size standard of $45 million. Offerors are required to have an active registration in SAM (www.sam.gov) at the time of submission of a proposal to be eligible for award. A Site Visit will be scheduled. See Section L of this solicitation for more information. Delivery: 365 Days After Notice to Proceed Delivery Location Code: 0009060582 NPS, JOSHUA TREE NP 74485 NATIONAL PARK DRIVE TWENTYNINE PALMS CA 92277 US complete the entire work ready for use not later than 365 days following receipt of the notice to proceed. The time stated for completion shall include final cleanup of the premises. Requests for Information regarding this solicitation must be submitted in writing to Jara_Woodard@nps.gov, 10 days before the closing due date and time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

28 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects