Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 30, 2022

July 22, 2022

September 20, 2022

Multiple Locations

Renovation

No Information to Display

$274,306.00

Public - City

img_map_placeholder

Multiple Locations, Wellston, OK

Subscribe to View Full Documents

Base Bid 1 1.00 LS Paint Interior of Water Storage Tank (Highway I-44 Tank) 2 1.00 LS Paint Interior of Water Storage Tank (School Tank) Alt Bid No. 1 1 1.00 LS Paint Exterior of Water Storage Tank (Highway I-44 Tank) 2 1.00 Ea. Exterior Ladder w/Cage and Handrails Alt Bid No. 2 1 1.00 LS Paint Exterior of Water Storage Tank (School Tank) 2 1.00 Ea. Exterior Ladder w/Cage and Handrails A bid bond in the amount of 5% of the total amount bid shall be attached to all bids as a guarantee that the successful bidder will, within ten (10) days of the date of notice of award, enter into contract and file the required bonds. No bidder may withdraw his bid within 45 days after the actual date of the opening thereof. The Owner reserves the right to reject any or all bids, waive any irregularities or technicalities without assigning any reason therefore, and to make the awards in the best interest of the Owner. Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the office designated in the solicitation by the time specified in herein. Any proposal, modification, or revision received at the office designated in the solicitation after the exact time specified for receipt of offers is late and will not be considered. Estimate $290,000 to $320,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.