Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
December 15, 2022
January 15, 2023
December 11, 2023
To Be Determined
Renovation, Site Work
No Information to Display
$197,450.00
Public - City
To Be Determined, Stigler, OK
Estimated January 15th for NTP. Water Storage Tank Improvements The Project consists of constructing/installing Water Storage Tank Improvements as required. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Each bidder must fully comply with the requirements, terms and conditions of the Department of Environmental Quality Small, Minority, Women's Businesses Requirements including affirmative steps to contract with small, minority and women's businesses during the performance of this contract. The bidder commits itself to the affirmative steps to contract with small, minority and women's businesses contained herein and all other requirements, terms and conditions of these bid conditions by submitting a properly signed bid. Requirements are contained in DEQ Guidance and Procedures, DW 700. Equal Opportunity in Employment: All qualified applicants will receive consideration for employment without regard to race, color, religion, sex or national origin. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the specifications. Davis Bacon Act wage rules shall apply. All laborers and mechanics employed by contractors and sub- contractors on projects funded directly by or assisted in whole or in part by and through the Federal Government shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of Chapter 31 of Title 40, United States Code. The Department of Labor provides all pertinent information related to compliance with labor standards, including prevailing wage rates and instructions for reporting. For more information please refer to online American Iron and Steel provisions also apply to projects funded directly by or assisted in whole or in part by and through the Federal Government pursuant to the "Consolidated Appropriations Act, 2014". Sec. 436(a)(1) of the act states that "None of the funds made available by a State Water Pollution Control Revolving Fund as authorized by title VI of the Federal Water Pollution Control Act (33 U.S.C 1381 et seq.) or made available by a Drinking Water Treatment Revolving Loan Fund as authorized by Section 1452 of the Safe Drinking Water Act (42 U.S.C. 300j-12) shall be used for a project for the construction, alteration, maintenance, or repair of a public water system or treatment works unless all of the iron and steel products used in the project are produced in the United States. Control Revolving Fund as authorized by title VI of the Federal Water Pollution Control Act (33 U.S.C 1381 et seq.) or made available by a Drinking Water Treatment Revolving Loan Fund as authorized by Section 1452 of the Safe Drinking Water Act (42 U.S.C. 300j-12) shall be used for a project for the construction, alteration, maintenance, or repair of a public water system or treatment works unless all of the iron and steel products used in the project are produced in the United States. This project will be subject to Build America, Buy America (BABA) requirements. The BABA Act requires none of the funds made available for a Federal financial assistance program for infrastructure, including each deficient program, may be obligated for a project unless all of the iron, steel, manufactured products, and construction materials used in the project are produced in the United States. The BABA Act requirement does not supersede the AIS requirement, and both provisions still apply and work in conjunction. Bid security shall be furnished in accordance with the Instructions to Bidders. Project no ST-22-02, P40-1020303-01 11/09/2022 at 3:00 PM CT
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Stigler, OK
Bid Date: Aug 10 2023
Stigler, OK
Bid Date: Aug 17 2023
Sand Springs, OK
Bid Date: Jan 10 2023
Minco, OK
Bid Date: Nov 16 2023
Mustang, OK
Bid Date: Nov 16 2023
Tulsa, OK
Bid Date: Nov 16 2023
Oklahoma City, OK
Bid Date: Nov 02 2023
Oklahoma City, OK
Bid Date: Nov 29 2023
Tahlequah, OK
Bid Date: Nov 16 2023
Tahlequah, OK
Bid Date: Nov 16 2023
Nash, OK
Bid Date: Nov 08 2023
Oklahoma City, OK
Bid Date: Nov 10 2023
Tulsa, OK
--
Ardmore, OK
Bid Date: Nov 30 2023
Wister, OK
Bid Date: Aug 05 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
