Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 5, 2024

August 3, 2026

5 Replin Rd

New Construction, Site Work

No Information to Display

$30,000,000.00

Public - City

img_map_placeholder

5 Replin Rd, Toronto, ON

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Development near Varna Drive and Ranee Avenue for construction for a Net Zero Emissions Building (NZEB) hub facility which includes a new Lawrence Heights Community Recreation Centre (LH CRC). Proposed features include: A six-lane, 25-metre lane pool; A leisure/tot pool; A double gymnasium with raised walking track; Universal change rooms and washrooms; Fitness/dance/aerobic studios; multi-purpose rooms; A community kitchen; A large lobby; Administrative space; An active roof; An outdoor playground with splash pad; Indigenous place-keeping elements; and WIFI access throughout the building. The building will also include a new City of Toronto Children's Services Child Care Centre for 88 children, which is proposed to include: Parent/staff resource room; Laundry room/toy washing station; Kitchen; Universal washrooms; Stroller storage space; Gross motor spaces; Lobby area; Infant playroom/sleep room; Toddler playrooms; Preschool playrooms; and Administrative and technical space. TIMELINE: The Request For Proposals from architectural services was awarded as of November 2022. The preliminary design is underway. Program Review is being undertaken by the architect with the owner. The project may proceed to the City of Toronto Design Review Panel early 2024. Schedules for Working drawings will be finalized early 2024 based on approvals. Tender is expected summer 2024 for construction start early fall 2024.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.