Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 5, 2023

May 15, 2024

September 30, 2024

1900 8th Ave NW

Renovation

No Information to Display

$3,303,000.00

Public - State/Provincial

img_map_placeholder

1900 8th Ave NW, Austin, MN

Subscribe to View Full Documents

The project includes the replacement of the existing ballasted EPDM Roof System with a new 4-ply built-up Roof System. Work will also include structural upgrades and replacement of the entryway curtain wall clerestory windows with a Minnesota State approved curtain wall system. The Bidder shall review Specifications Section 00 73 46, Prevailing Wage Rate Requirements, to determine the applicable prevailing wage rates, prevailing hours of labour, and hourly basic rates of pay that are applicable to this Project contract.This Project is subject to Minnesota Labor Standards and Wages requirements of Minnesota Statutes Chapter 177. The Owner reserves the right to reject any Unit Price which it considers unreasonable. Each bid, which totals over $100,000.00 shall provide a certified check, payable to Minnesota State or an electronic bid bond, payable to Minnesota State, in the sum of 5% of the total base bid; issued by a surety company duly authorized to do business in the state of Minnesota. Reference DIV00 43 14 Bid Bond, Exhibit A (Not required to use this form). The bid security is conditioned upon the Bidder entering into a contract with Minnesota State Colleges and Universities in accordance with the terms of the bid. It is agreed that bid security will constitute liquidated damages, and not a penalty, for the failure or refusal of the successful Bidder to execute and deliver the Owner-Contractor Agreement.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.