Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 4, 2021

March 1, 2021

January 27, 2023

Avery Rd & Shier Rings Rd

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Avery Rd & Shier Rings Rd, Dublin, OH

Subscribe to View Full Documents

The City of Dublin (City) is making this Request for Proposal (RFP) from qualified consultants to provide Construction Management (CM) Services (including Construction Administration, Construction Inspection and Materials Testing) for the University Boulevard - Phase 2 / Shier Rings Road and Avery Road Intersection Improvement project. University Boulevard - Phase 2: This project reconstructs the existing two-lane road with ditches to a four to five lane road (divided with median) with curb and gutter within 100 feet of right-of-way. Roundabouts will be constructed at Eiterman Road/University Boulevard, the main entrance to the OSU site, the intersection of University Boulevard/Shier Rings Road and at the entrance to the City's Fleet Maintenance facility. Approximately 1,400 ft. of existing Shier Rings Road will be re-constructed and 3,500 ft. of new roadway (University Boulevard) will be constructed. Shier Rings Road and Avery Road Intersection Improvement: This project includes intersection improvements including widening, a new traffic signal and the relocation of Old Avery Road to maintain access to the existing commercial businesses. The estimated construction cost of the Project is $17,700,000. Construction is anticipated to start in March/April 2021 with completion anticipated in January 2023. Anticipated Selection Notification 2/8/2021 Contract Executed 2/19/2021

42 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.