Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 29, 2020

January 29, 2021

No Information to Display

4332 N Paulina St

Renovation

No Information to Display

$33,950.00

Public - City

img_map_placeholder

4332 N Paulina St, Chicago, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

- The proposal shall be submitted with the attached Bid Cover Sheet completed in its entirety. - Warranty information, when applicable, shall also be included & submitted. - All work to be performed during normal working hours. - If bid price is over $25,000 or more, bidder must be signatory to relevant union, per terms of the Various Trades Contract and Project Labor Agreement. - If bid price is over $75,000, you MUST include your MBE/WBE subs and relevant forms at time of bid Boiler #1 Please provide labor, materials and equipment to: - Secure a permit from the City of Chicago Boiler Inspection Department.to gain access to our work. - Remove approximately (3) courses of brick from the firebox including the front burner wall. - Flame cut out and remove the entire lower 12" of the boiler bottom including the mudbar. - Install new 3/4 " thick mudbar and 3/8" steel plate to the entire bottom. - Bottom will have 7/8" stay rods installed. - Electrically arc weld new steel in place on the job site. - Replace the (2) courses of firebrick and patch the front wall refractory. - Fill the boiler and test. - After a successful test the entire boiler will be insulated using fiberglass insulation.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.