Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 25, 2023

August 25, 2023

No Information to Display

4934 S Wabash Ave

Renovation

No Information to Display

$47,300.00

Public - City

img_map_placeholder

4934 S Wabash Ave, Chicago, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Questions Due Date: Jul 11th 2023, 11:30 AM CDT Provide Labor and Materials: 1) Provide necessary labor and materials cut and remove the entire set of boiler tubes. 2) Clean the tube holes and normal debris in the boiler. 3) Furnish and install (344) 2"x110" tubes beaded at the front and rear. 4) Remove and replace all the waterside gaskets. 5) Fill and test the boiler. 6) Close the boiler. 7) Start burner to ensure proper operation. 8) Perform Factory Start Up Upon Completion. 9) Contractor to secure necessary permits. 10) Contractor to field verify dimensions and specifics of all projects listed above before placing bid. 11) Not responsible for contractor errors as a result of non-field verification. 12) Materials and installation must comply with CPS Standards and Specifications as listed on a. SECTION 23 01 51 STEAM AND HOT WATER BOILER RENOVATION 13) If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. 14) Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. 15) All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. 16) Contractor crew is to remove and dispose of materials torn out and any construction debris. 17) All trash must be removed off-sight by contractor, leaving area clean. 18) Secure job site overnight if work is not completed in one day. 19) Clean the surrounding area and make sure all is swept of debris. 20) All questions/requests must be received two (2) business days prior to bid closing

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.