Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

December 15, 2025

December 27, 2026

14500 W 151st St

Renovation

No Information to Display

$1,170,000.00

Public - City

img_map_placeholder

14500 W 151st St, Olathe, KS

3

11

2

5

Subscribe to View Full Documents

Question Deadline 09/16/2024 Questions received less than three (3) working days prior to the date for opening of bids will not be answered. The work consists of the following: Work shall consist of material, labor and equipment to blast and recoat the interior and exterior of Black Bob #2 Water Standpipe Facility (14500 W 151 st St., Olathe, KS 66062). Work shall include precleaning, interior and exterior surface blasting and recoating, painting of two logos, temporary containment system, painting of metal parts and appurtenances, replacement of a roof steel manway, installation of a ladder fall arrest system, disinfection in accordance with AWWA, site clean-up related to the site being placed back into service, and an add alternate recoating of the interior of a single (1) access pilaster. This project will provide the City with a new interior coating in accordance with the guidelines in the Technical Specifications on the existing cylindrical steel water standpipe with a capacity of 4,850,750 gallons and dimensions of approximately 108-feet in height and 85-feet in diameter exclusive of the additional approximately 30-foot dome-like roof. Work must be scheduled outside the peak demand season from mid-May to October. Work must be completed between October 1st and May 15th to the extent that the standpipe is able to be put back into service for peak demand season. A stop-work will be issued during peak demand season where contract days will not be counted. A notice to proceed is tentatively scheduled to be issued October 1st , 2025. No additional compensation will be made due to spanning multiple painting seasons at fault of contractor. Work shall consist of material, labor and equipment to blast and recoat the interior and exterior of Black Bob #2 Water Standpipe Facility (14500 W 151st St., Olathe, KS 66062). Work shall include precleaning, interior and exterior surface blasting and recoating, painting of two logos, temporary containment system, painting of metal parts and appurtenances, replacement of a roof steel manway, installation of a ladder fall arrest system, disinfection in accordance with AWWA, site clean-up related to the site being placed back into service, and an add alternate recoating of the interior of a single (1) access pilaster A satisfactory bid bond executed by the bidder or an acceptable surety, in an amount equal to five percent (5%) of the total bid for work shall be submitted with each proposal

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.