Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 21, 2020

October 5, 2020

August 23, 2021

Multiple Locations

Paving, Site Work

No Information to Display

$1,739,840.00

Public - City

img_map_placeholder

Multiple Locations, Chaska, MN

58

17

28

8

Subscribe to View Full Documents

As of 10/01/2020 The contractor award the project was Mid-America Golf. The amount was $1,739,840. Anticipated start date is 10/5. End date is August 2021. The Project Includes Mass Grading, Wetland and Storm Sewer Pond Enhancements Along With Sanitary Sewer and Water Main Service Improvements for Future Buildings Along With Bituminous Trail Construction. The Project Consists of the Following Approximate Quantities: 1 Ea Irrigation Wet Well / Building and Foundation 1 Ea Existing Irrigation Groundwater Well Repair 300 Lf 12 Irrigation Intake Pipe 400 Lf 4" Irrigation Supply Pipe 1 Ls Irrigation System Installation (Owner Provided Materials) 400 Lf 6 Pvc Water Main 800 Lf 4 Pvc Sanitary Sewer Pipe 1400 Lf 15 to 27 Storm Sewer Pipe 11 Ea Storm Sewer Structures 2 Ea Storm Sewer Treatment Manholes 10,000 Lf 4 and 6 Drain Tile 3000 Lf Sand Silt Drainage 31,500 Cy Common Excavation 600 Tn Class 5 Aggregate Base 300 Tn Bituminous Trail and Patching Pavement 100 Lf Concrete Curb and Gutter 5000 Sf Concrete Sidewalk and Driveways Along With Miscellaneous Other Utility Improvements, Removals, Restoration, Striping, Clearing and Grubbing, Landscaping Improvements, and Correlated Appurtenances. Direct Inquiries to Engineers Project Manager, Eric Lembke, at (612) 712-2079 or Alan Offerman at (651-308-9560). Bid Security in the Amount of 5 Percent of the Amount of the Bid Must Accompany Each Bid in Accordance With the Instructions to Bidders. The Owner Reserves the Right to Retain the Deposits of the 3 Lowest Bidders for a Period Not to Exceed 60 Days After the Date and Time Set for the Opening of Bids. No Bids May Be Withdrawn for a Period of 60 Days After the Date and Time Set for the Opening of Bids. The Owner Reserves the Right to Reject Any and All Bids, to Waive Irregularities and Informalities Therein, and Further Reserves the Right to Award the Contract to the Best Interests of the Owner. Furnishing of All Labor, Materials, and All Else Necessary for the Following: Chaska Par 30 Golf Course Improvements in General, Work Consists of the Redevelopment and Shaping of an Existing Golf Course Improving the Form and Function of the Facility. All New Greens and Tees as Well as an Entirely New Course Routing Will Be Part of the Project. Bid Security in the Amount of 5 Percent of the Amount of the Bid Must Accompany Each Bid in Accordance With the Instructions to Bidders. The Owner Reserves the Right to Retain the Deposits of the 3 Lowest Bidders for a Period Not to Exceed 60 Days After the Date and Time Set for the Opening of Bids. No Bids May Be Withdrawn for a Period of 60 Days After the Date and Time Set for the Opening of Bids. The Owner Reserves the Right to Reject Any and All Bids, to Waive Irregularities and Informalities Therein, and Further Reserves the Right to Award the Contract to the Best Interests of the Owner.

57 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects