Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

April 28, 2020

June 29, 2020

October 28, 2020

Multiple Locations

Outdoor Lighting, Paving, Site Work

No Information to Display

$496,515.00

Public - City

img_map_placeholder

Multiple Locations, Bogart, GA

Subscribe to View Full Documents

The work to be completed shall consist of furnishing all labor, equipment, and materials necessary to construct the Streetscape in Bogart including demolition and installation of approximately 500 LF of 10' wide concrete paver sidewalk, complete with stairs and handicap accessible ramps, handrail, 3,000 SY of asphalt overlay, landscaping, flag poles, electrical conduit, lighting, soil erosion and sediment control measures, and appurtenances necessary to provide a complete installation. Time allotted for substantial completion of work is 150 calendar days. Plans, Specifications and Contract Documents are on file at CARTER & SLOOPE, INC. and at Bogart City Hall.

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.