Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 9, 2019

November 6, 2019

April 24, 2020

Multiple Locations

Site Work

No Information to Display

$522,276.00

Public - County

img_map_placeholder

Multiple Locations, Reno, NV

Subscribe to View Full Documents

For STMGID Well Bypass Improvements Phase 2 Range for Engineer's Estimate: $405,00.00 - $495,000.00 Question Cutoff Date: 10/4/2019 08:00 PM (ET) Truckee Meadows Water Authority (TMWA) is accepting sealed bids for all labor, materials, equipment, and incidentals required for the STMGID Well Bypass Improvements Phase 2. The work to be done under this Contract will occur at 3 of TMWA's well sites located in Washoe County, Nevada. The Work consists of demolition of existing facilities, interior and exterior piping modifications and additions, trenching, backfill, drainage improvements, reinforced concrete, and electrical. Bid results and the bid tabulation will be posted on NGEM and bidders will be notified electronically of the results. TMWA reserves the right to reject any or all bids, including without limitation the right to reject any or all nonconforming, non-responsive, unbalanced, or conditional bids, and to reject the bid of any bidder if TMWA believes that it would not be in the best interest of TMWA to make an award to that bidder. TMWA also reserves the right to waive informalities. Bids will be evaluated as prescribed in Nevada Revised Statute 338.147. Anticipated Start Date: on or Before November 6, 2019 Completion Deadline: April 24, 2020 PROJECT SCOPE: Truckee Meadows Water Authority (TMWA) is accepting sealed bids for all labor, materials, equipment, and incidentals required for the STMGID Well Bypass Improvements Phase 2. The work to be done under this Contract will occur at 3 of TMWA's well sites located in Washoe County, Nevada. The Work consists of demolition of existing facilities, interior and exterior piping modifications and additions, trenching, backfill, drainage improvements, reinforced concrete, and electrical.

84 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.