Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 16, 2021

December 16, 2021

No Information to Display

Lake Kathryn Cir

Paving, Site Work

No Information to Display

$3,474,192.00

Public - City

img_map_placeholder

Lake Kathryn Cir, Casselberry, FL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Work specified in the "Scope of Services" generally includes improvements to Lake Kathryn Circle and other areas in its vicinity. Work includes but is not limited to: maintenance of traffic, clearing and grubbing, excavation, embankment, road base installation, asphalt paving, sidewalk, curb, concrete driveway aprons, inlets, storm pipes, brick pavers, landscaping, irrigation, pavement markings, Water main installation, Water main HDD, Water services, Water main abandonment, Water main adjustments, Sanitary Sewer Collection and transmission system, ROW to Resident lateral connections, Septic Tank Decommissioning and Abandonment, Force main installation and removal, bypass pumping, lighting conduit and pull box installations. Work includes all required Maintenance of Traffic (MOT) following FDOT standard specifications and all necessary Storm Water Pollution Prevention Plan (SWPPP) and Best Management Practices (BMPs) required by local jurisdictions. All pedestrian facilities shall adhere to current Americans with Disabilities Act (ADA) standards. The CONTRACTOR for this Project must perform at least forty percent (40%) of the work with its own forces. Question End Date 11/2/2021 3:00 PM

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects