Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2018

March 1, 2019

September 27, 2019

Multiple Locations

Remodeling, Renovation

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Chicago, IL

Subscribe to View Full Documents

PN 7270, which includes sewer improvements for the following streets: S Avers Av from W 71st St to W 72nd St W 72nd St from S Hamlin Av to S Springfield Av S Ridgeway Av from W 71st St to Alley South of W 71st St S Hamlin Av from W 70th Pl to W 70th St The work for which proposals are invited consist of furnishing all labor, equipment, tools, transportation, materials and services for the sewer improvements in S Avers Av from W 71st Stto W 72nd St, W 72nd St from S Hamlin Av to S Springfield Av, S Ridgeway Av from W 71st Stto Alley South of W 71st St, and S Hamlin Av from W 70th Pl to W 70th St. This includes but isnot limited to performing all work for the installation of 1,330 lineal feet of 24-inch internal diameter reinforced concrete sewer pipe; 481 lineal feet of 36-inch internal diameter reinforcedconcrete sewer pipe; installation of manholes and catch basins; installation of connection structures and tumbling basins; installation of temporary water main supports; construction ofconcrete collar connections, installation of drain connections. This includes but is not limited tosite mobilization, providing traffic control and protection for the duration of the contract, supporting, cut/cap and replacing, and/or abandonment of existing water main; removal and/orabandonment of existing sewer; all required excavation, trenching, grading, backfilling andcompaction of excavations; restoration of pavements, curbs, walkways, landscaped areas andremoval of all construction debris; as described in the detail specifications, including all appurtenant work and accessories, to the complete satisfaction of, approval and acceptance by the City. Site inspection shall be arranged through the Project Manager at the office of the Bureau of Engineering Services, Sewer Section, Jardine Water Purification Plant, Room 313 (+51), 1000 E. Ohio St., Chicago, IL. (Telephone 312-744-0408).

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects