Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 25, 2019

March 15, 2019

June 30, 2019

To Be Determined

Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

To Be Determined, Chicago, IL

Subscribe to View Full Documents

The work includes, but is not limited to, underground storm sewer pipes, storm sewer structures, soil erosion and sediment control practices, landscaping, and other related work as specified in the plans & specifications. During the bid process, all inquiries must be directed in writing and/or emailed to the District's Purchasing Agent as follows: Purchasing Agent Forest Preserve District of Cook County 69 W Washington Street, Suite 2060 Chicago, IL 60602 Fax: (312) 603-9961 Email: fpd.purchasing@cookcountyil.gov All questions must be received in writing by 5:00 p.m. January 14, 2019. The District seeks the following participation goals with respect to Minority-owned Business Enterprises ("MBE") and Women-owned Business Enterprises ("WBE") for this project: This determination is based upon the scope of work, estimated project cost and the availability of certified MBEs and WBEs that are certified to provide the type of work needed to successfully complete this project. Collectively, MBEs and WBEs shall be deemed "MBE/WBEs". Bidders requiring assistance in meeting these goals are encouraged to contact: Contract Compliance Administrator Forest Preserve District of Cook County (312) 603-8342 Email: sergio.silva@cookcountyil.gov PLANS AND DETAIL SPECIFICATIONS ARE: [X] included in the Detail Specifications and Special Provision Section of this document. [ ] are not included in this document and must be downloaded at the link below. Please note downloads may take a few minutes. (Documents are specifically part of the Contract documents.) DRAWINGS: N/A DETAIL SPECIFICATIONS: N/A Security bid Deposit Surety Statement of Qualification for Bonding Submission of a Certificate of Intent to Comply With the Cook County Resident Employment is required for all construction projects over $100,000 Work shall be substantially completed within 90 calendar days from the date that the District issues the Notice To Proceed. Substantial completion is the stage in the progress of the Work, as defined in the General Conditions, or a designated portion thereof, that is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. Liquated damages clause in Section GC-4(g) is applicable to the Work. The Contract shall end within 90 calendar days from the Substantial Completion date. The Contract end date is the date on which all Work shall be completed in accordance with the Contract Documents for the referenced project. (Work includes, but is not limited to, request for Final Payment and excludes any warranty related work.) If the Contractor does not employ tradesmen, the Contractor is exempt from the apprenticeship and training provisions of the Responsible Bidder Ordinance. As per the Responsible Bidder Ordinance For Construction Contracts as defined in the Forest Preserve District Code of Cook County (Code) Section 1-8- 2.S(5), all Contractors and subcontractors employing tradesmen shall be participants in active apprenticeship and training programs approved and registered with the United States Department of Labor Bureau of Apprenticeship and Training and shall submit evidence of such participation.

136 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects